As a general contractor in Bystřice nad Pernštejnem, we are responsible for the implementation of a concrete skatepark, paved paths, public lighting and also a pump track, which was taken care of by the company Marosana. The skatepark design consists of two levels. The upper level represents a large concrete floor with slappy grinds, i.e. an area free for learning to ride and free movement of children. The lower level of the skatepark is filled with numerous obstacles made of gray and pigmented red concrete. Riders of all levels and categories will have their fun. The dominant feature of the entire project is a long radius with a protruding china bank, which is a very rare obstacle in the Czech skatepark environment.

CLIENT:               Bystřice nad Pernštejnem

YEAR:                  2025

LOCATION:          Bystřice nad Pernštejnem

AREA:                  3500 m2